Load bank testing (LB Test) is a crucial part of generator maintenance, ensuring that standby and emergency power systems are ready to perform when needed. By simulating real-world electrical loads, this test verifies a generator’s capacity, identifies potential issues, and prevents performance degradation. Whether required for compliance or as a proactive maintenance measure, load bank testing helps businesses and facilities avoid unexpected failures and costly downtime. Below, we answer common questions about the process, its benefits, and best practices for scheduling and conducting a successful test.
Table of Contents
General Questions
What is load bank testing (LB Test)?
LB Test is a process that verifies a generator’s performance by applying an artificial electrical load to a generator to simulate a power outage.
Why is load bank testing important for generators?
It ensures that a generator can handle its full-rated capacity, prevents wet stacking in diesel engines, and helps identify potential performance issues.
How does it work?
A load bank applies incremental electrical loads to the generator, measuring voltage, frequency, and other performance metrics under controlled conditions.
What are the benefits of performing a LB test on my generator?
Benefits include improved reliability, prevention of carbon buildup, verification of fuel and cooling system performance, and compliance with industry standards.
Is load bank testing necessary for all types of generators?
While especially critical for standby and mission-critical generators, all generators benefit from periodic LB testing to verify operational integrity.
How is load bank testing different from building load testing (BLT)?
LB testing uses an artificial electrical load and a building load test uses the building’s current electrical load.

Scheduling & Planning
How often should I perform LB testing on my generator?
Industry standards recommend annual testing for standby generators and more frequent testing for mission-critical applications.
When is the best time to conduct a test?
LB testing is best scheduled during routine maintenance or periods of low operational demand to minimize disruption.
How long does a typical test take?
A standard test lasts between 1 to 4 hours, depending on the generator’s size and testing requirements.
Can I schedule LB test during regular maintenance?
Yes, LB testing is often integrated into routine maintenance plan to streamline service schedules and minimize downtime.
What should I consider when planning a load bank test?
Consider site access, generator capacity, fuel levels, cooling systems, and operational schedules to avoid conflicts with critical power needs.
What happens if there is a power outage during a load bank test?
If a power outage occurs, the test is typically stopped to allow the generator to support its the building’s electrical load.

Testing Process
What is involved in the LB testing process?
The process includes connecting a load bank equipment, applying incremental loads, monitoring performance, and analyzing key metrics such as voltage, frequency, and exhaust temperature.
What are the key parameters measured during a LB test?
Voltage, frequency, amperage, fuel consumption, coolant temperature, and exhaust emissions are commonly monitored.
What equipment is required for testing generators?
A resistive or reactive load bank, monitoring tools, and safety equipment are essential for conducting a proper test.
What are the steps to prepare my generator for a load bank test?
Steps include inspecting fuel and coolant levels, checking connections, verifying ventilation, and ensuring compliance with safety protocols.

Interpreting Results & Performance
What can I learn from the results of a load bank test?
The test reveals the generator’s ability to handle full capacity, identifies maintenance issues, and confirms fuel system and engine efficiency.
What should I do if my generator fails a load bank test?
If your generator fails a load bank test, you will need to complete the necessary repairs to address any identified issues, such as fuel system problems, cooling inefficiencies, or electrical faults. Once the repairs are completed, a retest should be performed to ensure the generator operates at full capacity under load.
How does load bank testing help identify potential issues?
It simulates operational stress, exposing hidden problems like insufficient fuel delivery, overheating, or degraded performance.
Can load bank testing improve generator performance?
Yes, by burning off carbon buildup in diesel engines (Wet Stacking) and ensuring all components function properly under load conditions.

Cost, Compliance & Risks
What are the costs associated with load bank testing?
The cost of load bank testing varies based on generator size, the equipment required, the challenges associated with equipment setup, and test duration. Contact our sales team for a free quote.
Is load bank testing covered under generator maintenance contracts?
Our generator maintenance agreements are tailored to our customer’s needs and budget. If your facility needs a LB test, we can incorporate that into your service plan. Contact our sales team to design the perfect plan for your business.
Are there any risks involved in load bank testing?
Risks are minimal when performed by professionals, but improper testing can lead to overheating or mechanical stress.
How can I minimize downtime during load bank testing?
Schedule tests during after hours or integrate them into planned maintenance to reduce operational impact.
Is load bank testing required for compliance with industry standards?
Yes, NFPA, The Joint Commission, and other industry regulations often mandate periodic load bank testing for emergency and standby power systems.